Construction is now progressing at full speed!

Click on the photo for a gallery of the work.

Concrete started to be poured.
March 3, 2008
Concrete was poured for the rest of the building.
March 10, 2008
The first pieces of the steel frame started to go up.
March 17, 2008
The steel beams that will form the roof are being assembled.
March 18, 2008
We now have a back door!
March 21, 2008
The back doors now have a wall.  The gym turned into a 3" swimming pool!
April 4, 2008
The roof is now complete and the side walls have been started.
April 26, 2008
The frame for the exterior walls have been completed.
May 7, 2008
Interior work is at full speed with the air conditioning ducts being installed.
May 22, 2008
 
The windows have been installed.
June 2, 2008
The bricks are being added.  It is beginning to look like a school.
June 19, 2008